Total Petrochemicals

 

This project is a 10,400 SF single-story, steel-framed structure with a composite roof deck and reinforced concrete masonry unit perimeter walls.  The structure is designed to withstand 2 PSI of overpressure.

 The facility features the following spaces:

  • Control Center - Consisting of a Console Area (with breathing gas outlets for board operators), UPS Room, and Rack Room (all with clean-agent fire suppression), Additional spaces include two Supervisor’s Offices, Field Techs, and Permitting.

  • House - Men and Women areas featuring lockers, restrooms, and showers.

  • Quality Control Laboratory - Wet and Dry lab areas with fume hoods and instrumentation. 14 different bottled gases fed to each island and perimeter bench spaces.

  • Additional spaces include two offices, a three-person tech station, and a supply Closet.